Commit Graph
7 Commits
Author SHA1 Message Date
rootandClaude Opus 5.5 4480fc346d refactor(copy): 术语统一——收录版本、模型服务、智能体等(DEAI-2)
- 版本目标 → 收录版本(前后端用户可见字符串、能力描述、给模型的提示)
- Agent 上游 / 上游 → 模型服务;界面上的 Agent / Agent 会话 → 智能体 / 智能体会话
- 身份歧义 / 识别有歧义 / 无法确定作品 → 没识别出作品;待识别(池) → 未识别
- 建档 → 加入媒体库;资产 → 文件;库根 → 媒体库目录;纳管 → 本工具 / 外部任务;
  哨兵 → 标记文件 / 检查目录;站点快照 → 抓取;Feed / RSS 订阅 / 来源健康 → RSS
- 代码标识符、API 字段名、迁移文件不改;glossary.md 同步;smoke 选择器跟随

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-29 20:35:43 +08:00
rootandClaude Opus 5.5 baf2d6ea04 feat(web): split plan page from tasks (FE-6)
- Nav overview group: 首页 / 任务 / 计划 / Agent 会话; tasks page drops the plan tab
- /console/tasks?tab=plan[&job=] redirects to /console/schedules[?job=]
- Plan page: 自动任务 compact grouped list (switch, interval preset/custom, last result,
  countdown, failure reason, run now/skip/run records) and Agent 巡检 cards (goal,
  allowlist, budget, upstream/model, trigger, cost per run, recent sessions); split stats
- Home plan band: two counts linking to #auto / #checks
- Docs: console-ia §7.4a, glossary, schedules runbook; smoke routes

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-29 17:13:54 +08:00
rootandClaude Opus 5.5 a00a9eaf5d feat(agent): budget reminders, usage while waiting, budget-exceeded status and dedupe
- tool results carry a budget reminder near limits; text before the last tool
  call is dropped as report when cut by budget/abort
- usage persisted when a run suspends, so waiting sessions show spent tokens
- task page shows budget_exceeded via business.outcome instead of completed
- budget-exceeded decisions merge by root cause (decision / schedule / goal
  template); new summaries added to investigate allowlist

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-29 01:58:28 +08:00
rootandClaude Opus 5.5 52402864d6 style(copy): punctuation rules and site-wide fix with a CI check (QA U11)
- glossary: 10 punctuation rules (full-width in Chinese, CJK/Latin spacing,
  full-width parens around Chinese, single ellipsis, 「」 quotes, period rules)
- scripts/check-copy-punctuation.mjs: checks string literals, templates and JSX
  text (not comments, types, keys, match/compare strings); --fix, --strict,
  --by-file; wired into deno task ci as check:copy in warn mode
- --fix applied to web, server and contracts; files other lanes were editing
  (subscriptions, sites, browser, agent, auth/account, inventory) left for them
- tests updated for the changed messages

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-28 20:09:29 +08:00
rootandClaude Opus 5.5 363f85b1a1 feat(server,contracts,web): dashboard library counts and engine runs triggeredBy/multi-status filters
- GET /dashboard: automation.library {entities, movies, series, seasons,
  episodes, assets} and automation.slotSatisfiedRate; home media overview
  shows the counts instead of placeholders.
- GET /engine/runs: `status` accepts comma-separated values; new
  `triggeredBy` filter (comma-separated) evaluated server-side by scanning
  batches and paging with the last inspected row's cursor (scan cap 2000).
- Task stream: source filter and the "active" tab (running,pending) are now
  one paginated server query.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-28 16:49:11 +08:00
rootandClaude Opus 5.5 615917bb45 feat(tasks,server,web): bridge outbox events to the SSE bus (U3)
OutboxRelay gains a `mirror` option: listed types are claimed even without a
task route and, after the claim transaction commits, published in order to
the realtime bus (publish failures are logged, delivery state unaffected).
The worker mirrors feed.*, decision.*, download.*, organization.* and
subscription.* (feed.due excluded) with their business-id payloads, so the
home page, inbox, task stream and feed tables finally receive them. Feed
tables refresh on feed.fetched / feed.health_changed; the task stream also
listens to feed and decision events.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-28 16:43:49 +08:00
rootandClaude Opus 5.5 d8b9bd9662 feat(web): unified task stream with plan tab, task detail drawer and audit links (FE-1)
Tasks page merges engine runs (with W9-I business fields) into one stream:
all / active / failed / plan tabs, filters for source, business kind, status
and time; detail drawer with business summary, timeline, collapsed engine
steps, cancel/retry and related audit links. The schedule board moves into
the plan tab; card history jumps to the stream filtered by schedule key.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-28 16:10:29 +08:00