Commit Graph
3 Commits
Author SHA1 Message Date
rootandClaude Opus 5.5 a9147e647d feat(downloads): fold download plans into download panel (DL-3)
- Waiting plans (approval / disk space / automation off / queued) are
  active-segment rows on /download-tasks/board, merged by created_at,
  counted, with approve / cancel actions; ?plan= deep links and legacy
  /downloads/plans routes redirect to the panel
- Download detail shows "why this download" (source, purpose, replaced
  version, reasons); raw evaluation in tech info
- Failed / cancelled / expired plans appear in the entity download
  history; rejected / revoked / expired approvals close draft plans
- New GET /acquisition-plans/{id}/why, POST /acquisition-plans/{id}/cancel
- User-facing copy no longer says 下载计划; glossary updated

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-30 01:15:25 +08:00
rootandClaude Opus 5.5 f0c2c79785 fix(downloads): show — instead of 待整理 for unorganized external tasks (DL-2b)
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-29 22:15:05 +08:00
rootandClaude Opus 5.5 3b340745bf feat(downloads): live speeds and active/completed split on the download panel (DL-2)
- GET /download-tasks/board?state=active|completed: per-torrent dl/up speed,
  ETA, seeds/leechs, downloader total speed (transfer/info), counts for both
  groups, latest organize result (status, reason code, open decision)
- live qB data cached per instance for 2 s with in-flight coalescing
- panel: total speed line, 进行中 / 已完成 segments remembered locally,
  4 s polling while the page is visible, mobile layout, "—" for zero speed

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-29 21:44:34 +08:00